Hi-Life Gratia Project
Viyyur, Thrissur
Hi-Life builders are stepping ahead with its beautifully designed living homes, Hi-Life Gratia, in Thrissur. Hi-life Gratia locates just 100 meters off Shornur Road, at Viyyur and 1.9 km from Ashwini junction. The B+G+13 floors structure carries of 50 beautifully designed 2 and 3 BHK apartments ranging from 1075 sq.ft to 1607 sq.ft. The location enjoys all the facilities required such as educational institutions, religious places, hospitals, shopping centers within its limits.
Hi-Life Gratia brings you close to nature with its greeneries and serene atmosphere, yet you are in the heart of town. Hi-life Gratia offers you maximum amenities best in its class and makes your life delighted and healthy.
RERA Number: K-RERA/PRJ/080/2020
QUICK ENQUIRY
- QUICK FACTS
- LOCATION INFO
Viyyur, Thrissur
Luxury 2 & 3 BHK Apartments
1075 sq.ft & 1201 sq.ft
1499 sq.ft & 1607 sq.ft
Building Permit No : VPW 1-BA(41552)/2017
- Off shornur main road0.1 Kms
- Temple0.2 Kms
- Church0.2 Kms
- Daya Hospital0.5 Kms
- Devamatha Public School1.2 Kms
- Govt.Engg. College1.7 Kms
- Big Bazaar1.9 Kms
- Ashwini Hospital1.9 Kms
- Vimala College2.0 Kms
- Kalyan Hypermarket2.2 Kms
- Chinmaya School2.6 Kms
- Swaraj Round2.6 Kms
- FLOOR PLAN
- SPECIFICATION
- AMENITIES
- LOCATION MAP
- VIDEOS
- Current Status
- Approved by
Structure | R.C.C. Framed Structure. Walls with Solid Concrete Blocks. |
---|---|
Flooring & Tiling | Vitrified tile flooring in all rooms.Toilets: Tiles for walls up to false ceiling and for flooring Kitchen: A working platform with polished granite top and stainless steel sink, with drain board. Glazed tiles dado above working platform up to a height of 50 cm. |
Sanitary & C.P. Fittings | Toilets: CP fitting & wall hung sanitary fixtures with concealed cistern. Exhaust fan and geyser provision in all toilets. Single lever diverter with shower in all toilets. |
Doors and Windows | Entrance door – Moulded/ flush door. Internal doors – Moulded/ flush door. Toilet door – Moulded/ flush door. Entry to balcony – UPVC sliding/openable. Windows – UPVC sliding/openable. Ventilators - UPVC. |
Painting | All internal walls putty finishing with plastic Emulsion paint. Ceiling: Putty & Plastic Emulsion for entire ceiling. |
Generator | Generator back up for common facilities such as lifts, common lighting, pumps etc. Generator back up inside each flat up to 500 watts for lights, fans, T V etc. |
Electrical | All wiring in concealed conduits and adequate power plugs, light and fan points etc., controlled by ELCB and MCBs with independent energy meters. TV Point - TV Point in Living room and Master Bed Room. Telephone – Telephone point in Living room and Master Bed Room. |
Water supply | Water supply through sump and overhead tanks / Open well. |
Lift | 2 fully automatic lifts (one passenger lift and one stretcher lift) |
Fire fighting | Fire fighting systems as per norms. |
A/C points | Provision for fixing split A/C in all bedrooms. |
- Furnished Lobby
- A/C Fitness Room
- Association Room
- Recreation Hall
- Well Furnished Guest Bed Room with Toilet, Exclusively for Residence Association of Gratia
- Kids’ Pool
- Kids’ Indoor Play Area
- Landscaped Garden / Children’s Play Area
- Drivers Room
- Caretaker Room
- Common Toilet
- Passenger Lift
- Service Lift
- Generator Power Back Up
- Sewage Treatment Plant
- Solid Waste Management
- Fire Fighting System
- 24 Hours Security Provision
- Intercom Facility
- Security Cameras at Entrance, Lobby and Selected Common Areas
- Guest Parking Facility
- Internet Connectivity Provision
- Cable TV Connection Provision
-
HI-LIFE GRATIA IS READY TO OCCUPY AND RECEIVED OCCUPANCY CERTIFICATE – 18-11-2021
-
BASEMENT & GROUND FLOOR CAR PARKING FLOORING, RECREATION AREA WORKS ARE PROGRESSING – 17-06-2021
-
FLOOR LOBBY, OUTSIDE PAINTING AND FIRE INSTALLATION WORKS ARE PROGRESSING – 22-03-2021
-
EXTERIOR PAINTING AND INSIDE LOBBY AREA FLOORING ARE PROGRESSING – 02-01-2021
-
FLOORING, DOOR FIXING AND LIFT INSTALLATION WORKS ARE PROGRESSING – 15-12-2020
-
OUTSIDE PLASTERING AT SOUTH-EAST SIDE IS PROGRESSING AND HANDRAIL FIXING IS COMPLETED – 06-11-2020
-
OUTSIDE PLASTERING AT WEST SIDE, ENTRANCE LOBBY AND INSIDE FLOORING WORKS ARE PROGRESSING – 09-10-2020
-
OUTSIDE PLASTERING & INSIDE FLOORING WORKS ARE PROGRESSING – 24-07-2020
-
OUTSIDE PLASTERING & COMPOUND WALL WORKS ARE PROGRESSING – 04-06-2020
-
EXTERNAL PLASTERING WORK IS PROGRESSING – 08-05-2020
-
TOP FLOOR ROOF SLAB WORK IS PROGRESSING – 10-03-2020
-
ELEVENTH FLOOR BRICK WORK AND NINTH FLOOR PLASTERING WORK IS PROGRESSING
-
THIRTEENTH FLOOR SLAB WORK IS PROGRESSING
-
TWELFTH FLOOR SLAB WORK IS PROGRESSING
-
ELEVENTH FLOOR SLAB WORK IS PROGRESSING
-
TENTH FLOOR SLAB WORK IS PROGRESSING
-
NINTH FLOOR SLAB WORK IS PROGRESSING
-
SEVENTH FLOOR SLAB WORK IS PROGRESSING
-
SIXTH FLOOR SLAB
-
FIFTH FLOOR SLAB
-
SECOND FLOOR ROOF SLAB 70% COMPLETED
-
GROUND FLOOR ROOF SLAB CASTING
-
BASEMENT ROOF SLAB CASTING
-
BASEMENT FLOOR RAMP SLAB AND RETAINING WALL
-
BASEMENT FLOOR SLAB
-
PILE CAP AND RAFT SLAB
-
PILING, PILE CAP CASTING AND LIFT PIT
-
PILING AND CHIPPING
-
SITE WORK STARTED
-
BHOOMI POOJA